What Campion DoCampion Case StudiesConact Campion PPS

Register

Campion Blog

Enter your email below to sign up for our newsletter to hear about industry news and our tips.

Facebook Twitter Linkedin

InetSoft BI Implementation at Fern

Jul 8, 2011

This weeks news is that Campion PPS have completed the implementation of the InetSoft BI solution at Fern Plastic Products.

Fern now have a comprehensive BI solution in place incorporating interactive dashboards and pixel-perfect operational reports combined with scheduling and alert functionality.

Previously, Fern managed their business via a set of KPIs that they produced manually each week by extracting data from their Baan ERP system that was then manipulated in spreadsheets.

The Problem:

- Reporting functionality within the ERP system was limited
- Manual and time consuming creation of weekly KPI graphs and matrices
- Manipulation of excel data resulting in different versions of the truth
- Month end process was manual and time consuming
- Accuracy risk posed by manual extraction, manipulation and presentation of the data

The Solution:

- InetSoft BI sitting on top of their Baan ERP system and data mashups with other data sources
- Fully flexible and interactive dashboard and reporting functionality 
- Operational reports auto sent daily to each manager
- Professional management reporting pack auto generated
- Month end process automated  
- System generated reporting pushed back process to be correct at data collection point rather than manipulated outside the system

The Results:

- More value leveraged from the core ERP system 
- Real-time, instant availability of KPIs, operational reports and strategic analysis giving the ability to make faster, better decisions
- Zero management time required to generate weekly KPIs 
- Month end processing time and effort vastly reduced 
- Process improvements 
- Risk reduction

Gavin Harper, the Production Director at Fern is pretty pleased with the results, "The process of generating the management information pack was taking us as a team on average 6 hours a week to generate the various elements to the pack. So that's valuable time we've got back now.  And we can see our KPIs whenever we need to now - this was only available and up to date once a week beforehand."

We're delighted to have helped Fern get a solid and robust BI platform in place that they can expand and grow alongside.